Need a UL Field Evaluation? We’ve Got You Covered. Call Today 410-949-1930


On-Site Inspections and Labeling from the Original NRTL and ANAB-Accredited Field Evaluation Body (FEB) Fast, nationwide field evaluations for unlisted equipment — without paying the UL premium.


Authority

Why Choose Eurofins MET Labs for Your UL Field Evaluation?

Many AHJs and inspectors request a “UL Field Evaluation,” but did you know:

An FEB-accredited Field Evaluation is typically what is required when we hear ‘UL Field Evaluation

Eurofins MET Labs is the original NRTL. Accredited by OSHA (since 1989)

Our field evaluation labels are trusted and accepted nationwide

Eurofins MET Labs has performed field testing since 1959

Solutions

Common Scenarios That Require UL Field Evaluations

  • Your equipment failed inspection due to a missing NRTL mark
  • You are importing or installing custom-built, unlisted, or foreign machinery
  • You modified a listed product and need to re-certify
  • You are relocating older equipment that never had a listing
  • Important: What inspectors often refer to as a “UL Field Evaluation” be performed by any qualified agency, including Eurofins MET Labs.

Services

UL Field Evaluation Services by MET Labs

We provide targeted services for complex equipment challenges.

 On-Site Evaluation & Labeling

We inspect, test, and label equipment on-site to meet required codes.

Remote Preliminary Evaluation

Submit technical documentation and get a Remote Preliminary Desktop Review to identify potential problems and give you confidence that you can avoid downtime and receive fast approval.

Lab-Based Evaluation

For bench-top or portable equipment, send us the unit for evaluation in one of our nationwide labs.

Process

Field Evaluation Process

Your path to inspection.

01

Submit Requirements

Contact us by calling 410-949-1930 or by clicking “Get a Field Evaluation Quote” to initiate your field evaluation.

02

Receive Your Quote

Our team prepares a detailed quote, typically delivered within a few hours.

03

Approve the Quote

Review and accept the quote so we can move forward without delay.

04

Schedule the Evaluation

We coordinate with you to schedule the on-site evaluation at a time that works best for your project.

05

Evaluation, Labeling & Report

After a successful field evaluation, an FEB-accredited label is applied to the equipment, and a full test report is issued within 10 days.

Bonus: We communicate directly with AHJs to ensure your label is accepted and paperwork delivered.

Benefits

Key Benefits of Choosing MET Labs

Reduce approval time, control costs, and keep your production moving.

Labeling accepted by OSHA and AHJs across the U.S.

Lower costs than traditional product listing

Fastest lead times in the industry

Avoid delays in installation, inspections or occupancy permits

Don’t Wait on UL — Get Approved Faster.

Talk to our experts today. Get your equipment labeled, inspected, and accepted on time with MET Labs.