What Are NFPA 790 and NFPA 791?

  • NFPA 790: Defines the qualifications, competence, and responsibilities of third-party field evaluation bodies (FEBs).
  • NFPA 791: Outlines the procedures and best practices for conducting field evaluations of unlabeled electrical equipment.

Together, they ensure safe, consistent, and code-compliant inspection alternatives for equipment that does not carry a listing or certification mark.

With increasing frequency, Authorities Having Jurisdiction (AHJs) will request accredited field evaluations when equipment fails inspection.

Why Choose Eurofins MET Labs?

  • OSHA-recognized NRTL since 1989
  • Fully compliant with both NFPA 790 & 791 standards
  • Labels accepted in all 50 U.S. states
  • Over 60 years of experience in field evaluations
  • Same-day service available in many regions

We support: – Manufacturers & OEMs – Facility managers – Electrical contractors – Importers & custom equipment builders

 

Talk to a Compliance Expert


 

When Do You Need an NFPA 790/791 accredited Evaluation?

  • Failed inspection due to missing UL/NRTL label
  • Installing modified or custom-built equipment
  • Imported equipment not previously evaluated for U.S. use
  • Failed inspection because your legacy equipment was manufactured before NRTL listing was a requirement and now it’s under scrutiny.

Don’t take risks with unaccredited agencies.  Many jurisdictions now only accept field evaluation reports from accredited agencies.

Services We Provide as an NFPA 790 & 791 accredited agency

On-Site Field Evaluation & Labeling
Evaluation and approval of equipment at your facility, based on NFPA 791.

Qualified Field Evaluation Body (FEB) Review
Our personnel meet all NFPA 790 qualifications, ensuring legal compliance and safety.

Final Reports & AHJ Communication
We prepare detailed test reports and liaise directly with your AHJ or electrical inspector.

Our Proven Process

  1. Submit your equipment details and inspection issue
  2. We evaluate the job scope and provide a quote
  3. On-site visit scheduled (often in 48 hours or less)
  4. Equipment tested, labeled, and documented
  5. Reports delivered and accepted by the AHJ

Bonus: We offer remote reviews and pre-screening to accelerate your project timeline.

 

Talk to a Compliance Expert


Why Clients Choose MET Labs for NFPA 790/791 accredited evaluations

  • Recognized NRTL with unmatched field experience
  • AHJ-trusted reports and documentation
  • Prevent downtime and costly redesigns
  • National reach and flexible scheduling

Real-World Success

“MET Labs saved our installation. They evaluated our unlabeled panel under and got AHJ signoff in 24 hours. We were back on schedule immediately.”

Need a Field Evaluation Agency that is accredited to NFPA 790 & 791?
Let our experts help you navigate inspections and achieve compliance fast.